Case Study: RBS Data Centre

Products

All Hydramist products have been rigorously tested to comply to industry standards.See all

See all products

RBS Datacentres

The RBS Group chose the Hydramist watermist technology for fire suppression to cover their data centres located throughout Edinburgh.

Hydramist designed a local application solution to protect each rack within each data centre and the design and installation was replicated across all locations across the city. The Hydramist high pressure watermist system is very effective at extinguishing fire and the specially designed pumps and engineered nozzles create a fine mist operating around 100 bar. The mist prevents no risk to either personnel or the environment and is ideal for use in data centres.